This is Christmas baking the Mescan way — rich, bold, and full of flavour. Inspired by a family favourite and brought to life with our Belgian-style beers, this cake swaps the usual spirits for Red Tripel, Spéartha Dorcha, or Beoir na Nollag. Soaked for days and matured for weeks, it’s the kind of cake that rewards patience — just like our beer.
Ma Moran’s Mescan-Soaked Christmas Cake
Ingredients
Fruit Mix
300g raisins
300g sultanas
300g currants
80g glacé cherries
50g mixed peel (preferably homemade)
1½ bottles of Mescan Red Tripel, Spéartha Dorcha, or Beoir na Nollag
Cake Mix
225g butter
200g soft brown sugar
4 extra-large free-range eggs
225g self-raising flour
1–2 tsp mixed spice (to taste)
85g ground almonds
50g flaked almonds (optional)
Method
Prepare the Fruit
Combine all the dried fruit, glacé cherries, and mixed peel in a large mixing bowl.
Pour over 1½ bottles of Mescan beer.
Cover with a clean tea towel and leave to soak for at least 24 hours, or up to 3 days. Stir occasionally.
(Optional but recommended: drink the remaining ½ bottle for quality control.)
Make the Cake
Preheat the oven to 180 °C.
Cream the butter and sugar together until light and fluffy.
Beat in the eggs one at a time.
Add flour, mixed spice, ground almonds, and flaked almonds (if using). Mix gently until just combined.
Fold in the soaked fruit and any remaining beer in the bowl.
Prepare the Tin & Bake
Line a 9″ round cake tin with buttered greaseproof paper and a layer of cardboard.
Pour in the batter and level the top.
Cover the top of the tin with a piece of cardboard to prevent over-browning.
Bake at 180 °C for 2 hours. Check the centre with a knife:
If it’s still very soft, continue at 180 °C for 1–2 more hours.
If nearly done but still a bit wet inside, reduce to 160 °C and bake for another hour, checking every 30–60 minutes.
Cool & Mature
Let the cake cool completely in the tin.
Once cool, remove, wrap in foil, and store in a cool, dry place.
Once a week, unwrap and drizzle a shot of Irish whiskey over the base.
Allow to mature for at least one month before serving — longer is even better.

Splash